Costa Rica vs Vanuatu: Total tetanus - number of reported cases, gaps filled
Costa Rica
0
in 2025
Vanuatu
0
in 2025
Costa Rica rank
106th
Vanuatu rank
106th
Total tetanus - number of reported cases, gaps filled over time
- Costa Rica
- Vanuatu
How they compare
Costa Rica currently reports 0 against 0 in Vanuatu, a difference of 0.
The two have swapped places 11 times across 44 shared years of data; in 1975 it was Costa Rica ahead.
Costa Rica ranks 106th and Vanuatu ranks 106th of 210 countries.
Across the 6 decades both report, Costa Rica averaged higher in 5 and Vanuatu in 1.
Head to head by decade
| Decade | Costa Rica | Vanuatu | Difference | Ahead |
|---|---|---|---|---|
| 1970s | 43.6 | 3.2 | 40.4 | Costa Rica |
| 1980s | 8.2 | 3.7 | 4.5 | Costa Rica |
| 1990s | 2.1 | 1.5 | 0.6 | Costa Rica |
| 2000s | 0.8 | 0.75 | 0.05 | Costa Rica |
| 2010s | 0.3333 | 0 | 0.3333 | Costa Rica |
| 2020s | 0 | 0.1667 | 0.1667 | Vanuatu |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher total tetanus - number of reported cases, gaps filled, Costa Rica or Vanuatu?
- Costa Rica, at 0 against 0 in Vanuatu as of 2025.
- What is the difference in total tetanus - number of reported cases, gaps filled between Costa Rica and Vanuatu?
- 0, with Costa Rica ahead.
- How many years of comparable data are there for Costa Rica and Vanuatu?
- 44 years are reported by both, from 1975 to 2025.
- How do Costa Rica and Vanuatu rank globally for total tetanus - number of reported cases, gaps filled?
- Costa Rica ranks 106th and Vanuatu ranks 106th of 210 countries.
- Where does this data come from?
- Statizoid (derived), published as Total tetanus - number of reported cases, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Total tetanus - number of reported cases with 793 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.