Colombia vs Switzerland: Neonatal tetanus - number of reported cases, gaps filled
Colombia
1
in 2025
Switzerland
1
in 2023
Colombia rank
55th
Switzerland rank
55th
Neonatal tetanus - number of reported cases, gaps filled over time
- Colombia
- Switzerland
How they compare
Colombia currently reports 1 against 1 in Switzerland, a difference of 0.
The two have swapped places 1 time across 31 shared years of data; in 1985 it was Colombia ahead.
Colombia ranks 55th and Switzerland ranks 55th of 210 countries.
Colombia has averaged higher in every one of the 5 decades both report.
Head to head by decade
| Decade | Colombia | Switzerland | Difference | Ahead |
|---|---|---|---|---|
| 1980s | 198.8 | 0 | 198.8 | Colombia |
| 1990s | 58.1 | 0 | 58.1 | Colombia |
| 2000s | 7.6 | 0 | 7.6 | Colombia |
| 2010s | 3.5 | 0 | 3.5 | Colombia |
| 2020s | 1.75 | 0.375 | 1.38 | Colombia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher neonatal tetanus - number of reported cases, gaps filled, Colombia or Switzerland?
- Colombia, at 1 against 1 in Switzerland as of 2025.
- What is the difference in neonatal tetanus - number of reported cases, gaps filled between Colombia and Switzerland?
- 0, with Colombia ahead.
- How many years of comparable data are there for Colombia and Switzerland?
- 31 years are reported by both, from 1985 to 2023.
- How do Colombia and Switzerland rank globally for neonatal tetanus - number of reported cases, gaps filled?
- Colombia ranks 55th and Switzerland ranks 55th of 210 countries.
- Where does this data come from?
- Statizoid (derived), published as Neonatal tetanus - number of reported cases, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Neonatal tetanus - number of reported cases with 616 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.